Lateness minimization in pairwise connectivity restoration problems

  • Igor Averbakh
  • , Jordi Pereira

Producción científica: Contribución a una revista › Artículo › revisión exhaustiva

6 Citas (Scopus)

Resumen

A network is given whose edges need to be constructed (or restored after a disaster). The lengths of edges represent the required construction/restoration times given available resources, and one unit of length of the network can be constructed per unit of time. All points of the network are accessible for construction at any time. For each pair of vertices, a due date is given. It is required to find a construction schedule that minimizes the maximum lateness of all pairs of vertices, where the lateness of a pair is the difference between the time when the pair becomes connected by an already constructed path and the pair's due date.We introduce the problem and analyze its structural properties, present a mixed-integer linear programming formulation, develop a number of lower bounds that are integrated in a branch-and-bound algorithm, and discuss results of computational experiments both for instances based on randomly generated networks and for instances based on 2010 Chilean earthquake data.

Idioma originalInglés
Páginas (desde-hasta)522-538
Número de páginas17
PublicaciónINFORMS Journal on Computing
Volumen30
N.º3
DOI
EstadoPublicada - 2018
Publicado de forma externaSí

Huella

Profundice en los temas de investigación de 'Lateness minimization in pairwise connectivity restoration problems'. En conjunto forman una huella única.

Citar esto