Resumen
This paper presents fundamentals of modelling wind generation for a probabilistic Cost-Benefit Analysis (CBA) for transmission planning. As known, wind generation exhibits intermittency as one of its main characteristics. This attribute of wind adds to the computational burden when planning the transmission system since the number of potential generation backgrounds sharply increases with respect to a pure conventional generation case. In order to tackle computational burden problems, simplifications in modelling become an important issue. Therefore, the impact of these simplifications on the overall result of transmission investment must be assessed. Basic concepts about transmission investment under the market perspective with (high) wind penetration are presented along with transmission distortions that may arise when making simplifications to model wind generation. We conclude that bundling similar wind scenarios into limited generation output possibilities leads to under/overestimate transmission investment without a clear pattern. In addition, the right number of minimum scenarios to consider so as to meaningfully estimate transmission investment depends not only on the amount of wind capacity installed but also on the nodal supply functions and demand.
| Idioma original | Inglés |
|---|---|
| Título de la publicación alojada | 2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources into the Power Delivery System, CIGRE/PES 2009 |
| Estado | Publicada - 2009 |
| Publicado de forma externa | Sí |
| Evento | 2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources into the Power Delivery System, CIGRE/PES 2009 - Calgary, AB, Canadá Duración: 29 jul 2009 → 31 jul 2009 |
Serie de la publicación
| Nombre | 2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources into the Power Delivery System, CIGRE/PES 2009 |
|---|
Conferencia
| Conferencia | 2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources into the Power Delivery System, CIGRE/PES 2009 |
|---|---|
| País/Territorio | Canadá |
| Ciudad | Calgary, AB |
| Período | 29/07/09 → 31/07/09 |
ODS de las Naciones Unidas
Este resultado contribuye a los siguientes Objetivos de Desarrollo Sostenible
-
ODS 7: Energía asequible y no contaminante
Huella
Profundice en los temas de investigación de 'Impact of wind generation intermittency on transmission expansion models'. En conjunto forman una huella única.Citar esto
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver