Resumen
We consider a robotic flowshop in which one type of product is to be repeatedly produced, and where transportation of the parts between the machines is performed by a robot. The identical parts cyclic scheduling problem is then to find a shortest cyclic schedule for the robot; i.e., a sequence of robot moves that can be infinitely repeated and that has minimum cycle time. This problem has been solved by Sethi et al. (1992) when m ≤ 3. In this paper, we generalize their results by proving that the identical parts cyclic scheduling problem can be solved in time polynomial in m, where m denotes the number of machines in the shop. In particular, we present a dynamic programming approach that allows us to solve the problem in O(m3) time. Our analysis relies heavily on the concept of pyramidal permutation, a concept previously investigated in connection with the traveling salesman problem.
| Idioma original | Inglés |
|---|---|
| Páginas (desde-hasta) | 952-965 |
| Número de páginas | 14 |
| Publicación | Operations Research |
| Volumen | 45 |
| N.º | 6 |
| DOI | |
| Estado | Publicada - 1997 |
| Publicado de forma externa | Sí |
Huella
Profundice en los temas de investigación de 'Cyclic scheduling of identical parts in a robotic cell'. En conjunto forman una huella única.Citar esto
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver