The Role of Delays in the Performance of Blasting

Jacopo Seccatore, Stefano Vigna, Tatiane Marin, Marilena Cardu

Research output: Contribution to journalArticlepeer-review

1 Scopus citations

Abstract

When researching rock blasting, the design parameters typically used for analysis are the geometric and charging parameters. This study focuses on a different approach based on the effect of timing, specifically the role of delays in the initiation sequence. Data were obtained from the results of full-scale blasts. The experimental setting and location allowed us to consider all parameters, other than the number of delays, as constants. The experimental results were analyzed, relating the delay variables to the fragmentation and KPIs of downstream operations. It was found that increasing the number of delays per unit of blasted rock and reducing simultaneous adjacent holes produces finer fragmentation, reduces the amount of fines, facilitates secondary operations, and reduces the risk of flyrock.

Original languageEnglish
Article number4657
JournalApplied Sciences (Switzerland)
Volume14
Issue number11
DOIs
StatePublished - Jun 2024
Externally publishedYes

Keywords

  • KPIs
  • delays
  • drill and blast
  • mining
  • timing

Fingerprint

Dive into the research topics of 'The Role of Delays in the Performance of Blasting'. Together they form a unique fingerprint.

Cite this