Abstract
We propose a sequential heuristic approach to optimize inventory service levels in a two-stage supply chain. The proposed approach deals with service level and inventory decisions, simultaneously with network design decisions, and incorporating unfulfilled demand costs in a previous inventory-location model. A two-step formulation is considered, where the first step optimizes service level and the second step addresses location and inventory decisions. Each algorithm iteration solves an inventory-location model for a fixed service level, and then the service level is updated in order to reach an equilibrium condition between operating system and unfulfilled demand costs. The algorithm converged in three iterations for a set of sample instances, obtaining the same outcome in comparison with a more intuitive, exact, but more time-consuming search procedure.
| Original language | English |
|---|---|
| Pages (from-to) | 276-285 |
| Number of pages | 10 |
| Journal | International Journal of Production Economics |
| Volume | 122 |
| Issue number | 1 |
| DOIs | |
| State | Published - Nov 2009 |
| Externally published | Yes |
Keywords
- Distribution network design
- Facility location problems
- Inventory control decisions
- Inventory-location models
- Service-level optimization
Fingerprint
Dive into the research topics of 'Inventory service-level optimization within distribution network design problem'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver