Abstract
We consider a robotic flow shop model in which a single robot is responsible for the transportation of parts between machines. For reasons of simplicity, when the shop is to produce a large number of identical parts, the robot usually performs repeatedly a fixed sequence of activities. This sequence of activities is called a 1-unit cycle if each execution of the sequence results in the production of exactly one part. It has been conjectured that 1-unit cycles yield optimal production rates for 3-machine robotic flow shops. We establish the validity of this conjecture.
| Original language | English |
|---|---|
| Pages (from-to) | 35-54 |
| Number of pages | 20 |
| Journal | Journal of Scheduling |
| Volume | 2 |
| Issue number | 1 |
| DOIs | |
| State | Published - 1999 |
| Externally published | Yes |
Keywords
- Automated manufacturing
- Cyclic scheduling
- Flow shop
- Sequencing