Cyclic scheduling in 3-machine robotic flow shops

Research output: Contribution to journalArticlepeer-review

46 Scopus citations

Abstract

We consider a robotic flow shop model in which a single robot is responsible for the transportation of parts between machines. For reasons of simplicity, when the shop is to produce a large number of identical parts, the robot usually performs repeatedly a fixed sequence of activities. This sequence of activities is called a 1-unit cycle if each execution of the sequence results in the production of exactly one part. It has been conjectured that 1-unit cycles yield optimal production rates for 3-machine robotic flow shops. We establish the validity of this conjecture.

Original languageEnglish
Pages (from-to)35-54
Number of pages20
JournalJournal of Scheduling
Volume2
Issue number1
DOIs
StatePublished - 1999
Externally publishedYes

Keywords

  • Automated manufacturing
  • Cyclic scheduling
  • Flow shop
  • Sequencing

Fingerprint

Dive into the research topics of 'Cyclic scheduling in 3-machine robotic flow shops'. Together they form a unique fingerprint.

Cite this